top of page
HALLMARK PROJECT SHOWCASE
project
Ormiston Hospital
![Hallmark Doors at Ormiston Hospital](https://static.wixstatic.com/media/19d5e3_4912278fa6924fe9b2b76f79235ef552~mv2.jpg/v1/fill/w_147,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/19d5e3_4912278fa6924fe9b2b76f79235ef552~mv2.jpg)
Hallmark Doors at Ormiston Hospital
Hallmark Doors at Ormiston Hospital
![Hallmark Doors at Ormiston Hospital](https://static.wixstatic.com/media/19d5e3_05ec8813fbc34fd398d6e7af5fb23321~mv2.jpg/v1/fill/w_147,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/19d5e3_05ec8813fbc34fd398d6e7af5fb23321~mv2.jpg)
Hallmark Doors at Ormiston Hospital
Hallmark Doors at Ormiston Hospital
![Hallmark Doors at Ormiston Hospital](https://static.wixstatic.com/media/19d5e3_af671b02592a481398c24b789b627677~mv2.jpg/v1/fill/w_147,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/19d5e3_af671b02592a481398c24b789b627677~mv2.jpg)
Hallmark Doors at Ormiston Hospital
Hallmark Doors at Ormiston Hospital
![Hallmark Doors at Ormiston Hospital](https://static.wixstatic.com/media/19d5e3_4912278fa6924fe9b2b76f79235ef552~mv2.jpg/v1/fill/w_147,h_90,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/19d5e3_4912278fa6924fe9b2b76f79235ef552~mv2.jpg)
Hallmark Doors at Ormiston Hospital
Hallmark Doors at Ormiston Hospital
1/9
LOCATION
Auckland
PROJECT PARTNERS
Architects: Klein Architects
Construction Company: Savory
ABOUT
This 4,500 square metre extension of the existing Ormiston Hospital building is a four-level structure including a new endoscopy suite with three operation rooms, 15 extra beds, 900 square metres of consulting space.
SOLUTIONS
Hallmark supplied 155 doors for this healthcare project including fire-rated steel frame door sets, single, double and opposing swing 1.5 leaf doors, acoustic rated door sets ranging from STC25 to STC40, and face sliding doors.
bottom of page